GloryBe Restoration
Home
Underway
History
Marina Fire
Restoration
Side Decks
 

 

 

Before the side deck could be started the new frames needed to go in. The biggest trick was figuring out how to clamp them in this area since there wasn't anything to clamp them to. Ryan created this nifty jig.

 

Roger and Ryan contemplate the approach.

 

Chiseling "landing" spots for the outboard end of the beams which will hold the side deck up.

 

Glueing up the final side deck with its components.

 

Pattern for the top of the sidedeck.

 

Sidedeck in place, fastened, and sanded.

 

Caulking.

 

In place, with the cabinsides installed as well.

 

 

Prepping for canvas.

 

Cap rail dry fit.

Rabbet helps hold breakdeck rail in place.