GloryBe Restoration
Home
Underway
History
Marina Fire
Restoration
The Stem
 

Post-fire remains of top of stem.


The remaining stem.

 

Stem with planking cut away and top removed. The stem forward of the rabbet was sliced off after this photo was taken.

 

 

 

Forward portion of replacement stem clamped in place to check fit. This extended below waterline to replace dutchman that was right at waterline.


Stem bolted in place, bedded in dolphinite, with new planking going in.